The Challenge

A textile processing cluster generated highly variable, dye-laden and chemically aggressive effluent that required absolute zero liquid discharge, water recovery for reuse, and stable regulatory compliance through wide swings in load and colour.

What GSI Delivered
1

Integrated CETP and ETP treatment train using low-flux PTFE MBR, high-recovery RO, and thermal concentration

2

Process sizing based on peak variability instead of average influent conditions

3

Pretreatment protection for aggressive textile chemistries to preserve membrane stability

The Outcome

The installation achieved ZLD performance, recovered more than 90% of water for reuse, and supported 24x7 continuous operation for a demanding textile wastewater profile.