A textile processing cluster generated highly variable, dye-laden and chemically aggressive effluent that required absolute zero liquid discharge, water recovery for reuse, and stable regulatory compliance through wide swings in load and colour.
Project Case Study
Textile Cluster ZLD
1
Integrated CETP and ETP treatment train using low-flux PTFE MBR, high-recovery RO, and thermal concentration
2
Process sizing based on peak variability instead of average influent conditions
3
Pretreatment protection for aggressive textile chemistries to preserve membrane stability
The installation achieved ZLD performance, recovered more than 90% of water for reuse, and supported 24x7 continuous operation for a demanding textile wastewater profile.